Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
cayuse [2012/01/10 14:50]
landon
cayuse [2012/10/16 09:58] (current)
ethanminot
Line 15: Line 15:
   *Many parts of the Cayuse budget will auto-fill, but a notable exception is indirect costs. The modified total direct costs have to be calculated by hand (as of Jan 2012). ​   *Many parts of the Cayuse budget will auto-fill, but a notable exception is indirect costs. The modified total direct costs have to be calculated by hand (as of Jan 2012). ​
   *To start the approval routing chain (equivalent of collecting signatures on the old proposal transmittal form), add yourself to the top of the chain.   *To start the approval routing chain (equivalent of collecting signatures on the old proposal transmittal form), add yourself to the top of the chain.
 +  *Where do you upload your actual proposal? This is not intuitive. (I need to add a screen shot)
 +  *The data management plan for NSF proposals goes in the "Other Project Information"​ section. The attachment must include the word "​DataManagementPlan"​. ​
  
 ====== Rates ====== ====== Rates ======

QR Code
QR Code cayuse (generated for current page)